Challenge: A local technological firm had constructed a control temperature room which was positioned on top of a section of factory floor which was poured with a low spot causing a void beneath the control temperature room. The room had been shimmed to level but a ¾” void remained beneath. Solution: Raise Rite found that the problem could be fixed...
Read more
Challenge: An area construction company had poured various sections of concrete at a nearby warehouse a few years ago. Due to slab curl, the sections had begun to move up and down when extreme pressure was applied to the loading dock and aisles throughout the warehouse. Solution: The contracting company and warehouse owners wanted to correct the problem so as...
Challenge: There was a low spot across the 45′ span of Hwy. 22 off-ramp roadway from Hwy. 141. Traffic would dip as it traveled across the problem area, causing safety concerns to the county highway department. Solution: RaiseRite was commissioned to raise a 15X45′ section of Off-Ramp located in Oconto. Polyurethane foam raising was selected as the best repair method...
Challenge: RaiseRite Concrete Lifting was called by a roadway contractor informing us that concrete roadway panels beneath the asphalt paving on I-94 in Milwaukee, Wisconsin had voids, leading to a rocking back and forth of the panels as trucks would drive over this portion of the road. The roadway contractor needed to stabilize the area within 36 hours. The work...
Challenge: Various areas of a 42 mile stretch along I-294 had experienced settlement, leading to dips and bumps that posed safety challenges for drivers. The project had to be completed during the night, due to the high traffic volumes of the tollway during the day and the inability to have lane closures restricting steady traffic flow. The project, due to...