CASE STUDY

Kentucky Riverport

Problem

A Riverport in Kentucky contacted their local polyurethane concrete lifting and void filling contractor to assist with a new construction project. When installing metal pilings on the bottom of the river, the construction crew ran into a rock shelf. The rock shelf kept the pilings from being able to be driven down and caused voids along the bottom of the pilings.

Summary

Deep Foamjection with HMI’s HF402 was chosen to fill the voids due to the large body of water and wet conditions. HydroFoam was specially designed to resist hydrolysis, the chemical process of water breaking down a compound. Designed not only to set up in the presence of water, but to maintain dimensional stability, HydroFoam was the best solution for the job.

The void filling contractor teamed up with a construction company and a team of underwater divers to inject the foam and fill the voids at the bottom of the pilings. The pilings were approx 20’ deep in the river. The river divers swam down and pushed the ground rods over to the edge of the void and into place. The crew used a crane basket to lower down to the surface of the water. Once in position, the polyurethane crew gave a series of injections into the void until it was completely full of foam.

Conclusion

This deep foamjection project saved the construction company thousands of dollars and was completed in just a few hours.

LEARN HOW TO START A SUCCESSFUL
CONCRETE RAISING BUSINESS

This site is protected by reCAPTCHA and the
Google Privacy Policy and Terms of Services apply.

Upcoming Discovery & Training Seminars

  • May 16-17, 2024  Manitowoc, WI
  • June 20-21, 2024  Manitowoc, WI

In 2 days, we teach you everything you need to know to start your own concrete raising company!

Cookies & Your Privacy

This website uses cookies to ensure you get the best experience on our website. More Information >