How HMI Supports Contractors in Making the Right Choice
At HMI, we understand that no two settlement problems are the same. That’s why our role goes beyond supplying polyurethane systems — our engineering support is here to help evaluate projects and recommend the right solution, even if it isn’t an HMI product. We work with contractors to weigh the benefits of Deep Foamjection™ and piering so they can deliver lasting results with confidence.

Contractor Decision Framework
At HMI, we guide contractors to:
- Choose Deep Foamjection™ when soil stabilization, lifting, or broad-area support is needed — including under heavy structures where improved soils can carry the load.
- Consider Piering when deeper, unstable soils must be bypassed or when direct load transfer to bedrock is the most practical choice.
- Use a Hybrid approach when projects benefit from combining methods — for example, stabilizing soils with foam while installing piers at concentrated load points.
Our engineering team helps evaluate each project and determine whether polyurethane, piering, or a combination is best.
Partner with HMI for Your Next Project
Whether your job calls for the coverage and efficiency of Deep Foamjection™, the direct transfer of piering, or a combination of both, HMI is here to help you make the right decision. Our engineering and customer support gives contractors the confidence that the solution recommended is the best fit — even if that solution isn’t one of our products.