The bridge deck sits on piles and the approach ramps are hinged on the bridge to allow even, gradual settlement between the asphalt roadway resting on the grade and the bridge. After many years, the slope of the ramp became too great for traffic, causing almost a “jump” at the hinge point. This was also a high traffic location, which made shutting down the full bridge for any length of time infeasible.
A technique was designed to effectively hinge the bridge slab and inject polyurethane below a portion of the concrete using hydraulic jacks and a fast density polyurethane. The crew was able to lift and support the bridge section using 19.5 cubic meters of polyurethane.