During construction of an electrical substation, engineered elevation specifications were communicated incorrectly. The concrete slab was poured well and remained structurally sound, but the finished elevation was approximately 2–3 inches too low.
The issue was not the quality of the concrete; it was the final elevation. The project team needed a way to bring the pad closer to the required specification without destroying a massive, newly poured reinforced slab.
The replacement option would have required breaking up and removing the pad, re-forming, re-pouring, and waiting for the new concrete to cure. With late-fall conditions approaching, replacement would have delayed the project schedule into spring of the next year.
Several critical challenges defined the project:
ECO Concrete Leveling was brought in to perform the lift using HMI 402 Hydrofoam.
ECO Concrete Leveling used HMI 402 Hydrofoam to raise the electrical substation slab in a controlled, staged injection process.
Because the pad contained a significant amount of reinforcement, the injection pattern and spacing were dictated by concrete scanning. A standard hole pattern was not practical. Instead, injection locations were selected around the scan results to avoid the dense rebar layout while still placing material in the zones needed to create controlled lift.
The ECO crew injected 1,718 lbs of HMI 402 Hydrofoam beneath the slab. Material was injected incrementally while the crew monitored slab movement, allowing the lift to be adjusted as the foam expanded and built support below the concrete.
Key project specifications included:
Using polyurethane injection eliminated the need to demolish and replace the pad. It also avoided additional disposal, labor, forming, re-pouring, curing, and the long seasonal delay associated with a replacement approach.
ECO Concrete Leveling successfully raised the massive electrical substation slab approximately 2.4 inches using 1,718 lbs of HMI 402 Hydrofoam.
The polyurethane lifting solution provided a faster and more economical alternative to replacement. The work was completed for less than 50% of the estimated replacement cost and helped keep the project much closer to its regular construction schedule instead of delaying completion into spring of the next year.
For the customer, the solution avoided the cost, disruption, and downtime of a re-pour. For ECO, the project was a profitable, high-value job that demonstrated the capability of HMI 402 Hydrofoam on a large-scale industrial concrete lifting application.
This project demonstrates how a structurally sound but out-of-elevation slab can be corrected using a scan-based injection plan, controlled lift monitoring, and the right polyurethane material for the job.
This site is protected by reCAPTCHA and the
Google Privacy Policy and Terms of Services apply.
In 2 days, we will teach you what you need to know to successfully tackle soil improvement projects!
4466 Custer Street
Manitowoc, WI 54220